Skip to main content
Home · Locations
Locations

All Locations

We pick up across Singapore on the schedules our clients' refresh cycles need — scheduled per engagement across primary and secondary metros cities. Per-asset Certificate of Destruction admissible to MAS TRM and Singapore PDPA. SGD settlement against PO. NDA standard. Multi-site programme engagements span the full national footprint with single SOW, country-lead executing locally, programme manager based with you.

Cities we serve

CBD · Raffles Place

Pickup scheduled per engagement, SGD settlement.

Marina Bay

Pickup scheduled per engagement, SGD settlement.

Changi Business Park

Pickup scheduled per engagement, SGD settlement.

One-North

Pickup scheduled per engagement, SGD settlement.

Jurong East

Pickup scheduled per engagement, SGD settlement.

Mapletree Business City

Pickup scheduled per engagement, SGD settlement.

Science Park

Pickup scheduled per engagement, SGD settlement.

Woodlands

Pickup scheduled per engagement, SGD settlement.

Coverage and pickup SLAs across Singapore

Island-wide Singapore, scheduled per engagement. Asset-level manifest signed at every transfer. NIST SP 800-88 Rev. 1 destruction matched to media classification. IEEE 2883-2022 firmware Sanitize for SSD/NVMe. SGD settlement against PO. Witness destruction available for top-classified material — typically required for MAS TRM-regulated entities and for Singapore PDPA-restricted-data engagements. Mobile shred units deployable for engagements that cannot leave site.

Multi-city programme engagement model

A typical multi-city Singapore engagement runs as a programme: programme manager based with you, country leads coordinating local execution, single SOW spanning the full footprint, single ledger, monthly reporting cadence. Cross-border engagements (within Singapore) are consolidated to your reporting-currency entity through internal Maxicom inter-company arrangements. Reuse-First reuse rate of 65-75% blended; programme engagements typically improve their reuse rate year-over-year as the engagement learns the asset mix.

Industries we serve across Singapore cities

BFSI back-office and branch network refreshes (banking, capital markets, payments processors). Government, GLC, semi-government and federal department IT. Healthcare (hospitals, lab networks, imaging system retirement, EMR-aligned chain of custody). Hyperscale data-centre tenant exits (multi-hall pulls, structured cabling reclaim, AI cluster repatriation). Manufacturing (OT/IT separated retirement, ICS/SCADA hardware, plant maintenance windows). Insurance, higher education, oil & gas, retail, sovereign wealth, AI startups, telecom and media. All twelve industry profiles map to engagement patterns documented on the per-industry pages.

Standards and regulators in scope across the country

Universal: NIST SP 800-88 Rev. 1, IEEE 2883-2022, DoD 5220.22-M (where contractually specified), NAID-grade Protocol. Region-specific: NIST 800-88 · PDPA · MAS TRM · NAID-grade · IEEE 2883-2022. BFSI engagements add MAS TRM; personal-data processing under Singapore PDPA. Per-asset Certificate of Destruction is admissible against all simultaneously — one document covers every framework an auditor in Singapore is likely to ask about.

Maxicom Singapore Pte Ltd
Island-wide ITAD & IT-asset buyback · 51 Goldhill Plaza, Singapore 308900
Reviewed by the Maxicom compliance desk. Last updated April 2026.
Operates to NIST 800-88 · PDPA · MAS TRM · NAID-grade · IEEE 2883-2022
Frequently asked questions

Frequently asked questions

Where in Singapore does Maxicom operate?

Island-wide, with collection scheduled per engagement across the CBD and Raffles Place, Marina Bay, Changi Business Park, One-North, Jurong East, Mapletree Business City, Science Park and Woodlands.

Do you collect on-site?

Yes — on-site collection and, where required, on-site data destruction with a witness option. Loading access and packing are arranged per engagement.

Is there a minimum volume?

Buyback and ITAD are structured for enterprise and fleet volumes rather than single units. We scope each engagement to the size of the estate.

How is a pickup arranged?

Send the asset list; we confirm a collection window, loading access and packing requirements in the engagement plan, then coordinate the pickup across Singapore.

When you are ready

Send the asset list. We will send the number.

A photograph of the rack works. A spreadsheet works better. SGD settlement, against PO.

[email protected] · per engagement